Originally Posted by
dennis13030
Q1.what would i use for the -and+ straps on the outside of the pipe
A1. use 10-16 AWG copper wire with the crimped spade/fork connectors.
Q2. the red and black bolts that go thru all of the plates would that not have power on them and make the neutral plates have power to them?
A2. The building is up to you. You must provide insulation where it is needed and electrical connection where they are needed. The electrical connections to the inner plate usually pass the the outter plate and neutral plates that have there holes slightly over sized(as not to make connectoin with them).
Q3. i have not bought the stuff yet and do not know how thick the washers will be about how far apart is the best for the plates
Q3. 1/8" is a good spacing.
Q4. will the screw on lid be tight enough to not leak or will i have to make a gasket of some kind
A4. You will need to pre4ssure test the container with the lid on. Just empty the container, put the lid on with the output fitting/tube, hold the unit under water and blow into the out put tube. if there are bubbles, you have a leak that needs to be fixed.
Q5. has anyone made one like this before if so how much gas did it make
A5. Search this form, maybe?