c02cutter
08-25-2008, 09:02 PM
As a response to here and other places I have sold plates too. I will have the have all the hardware pieces to assemble the Mummy Cell as a complete kit form, or as just ordering hardware pieces. At first I will only have the pieces involved for the Mummy Cell, but over time will start to handle other size hardware.
All hardware will be 5/16”, and will be these items...
2pcs. Nylon all thread 2 1/2” long 5/16 x 18 thread
4pcs. Nylon nuts 5/16 x 18
2pcs. 316 stainless steel nuts
24pcs. Nylon washers .062” thick
This is a minimum to do the cell. But will offer the heavy duty kit also.
As for your terminal connections, I leave that to the customer as there are too many variables to a persons design. I have also held off in finishing the pdf till these components come in, wanted to do the picks with parts that I can get all the time for the cells. I hated the doing it out of stuff I bought from the discount hardware stores as I had to substitute with dissimilar parts.
I am also working on a heat shrink deal. Just not far enough along to share more on it.
I will work up pricing for the kit tomorrow, but wanted you all to know it is a happening thing. I am working on it all actively. Time frame for this all to happen is approximately a week, maybe a week and a half. Some of the parts in the quantities involved are 7 to 10 day lead time on my ordering for me.
Just a heads up, happy building all!!!
All hardware will be 5/16”, and will be these items...
2pcs. Nylon all thread 2 1/2” long 5/16 x 18 thread
4pcs. Nylon nuts 5/16 x 18
2pcs. 316 stainless steel nuts
24pcs. Nylon washers .062” thick
This is a minimum to do the cell. But will offer the heavy duty kit also.
As for your terminal connections, I leave that to the customer as there are too many variables to a persons design. I have also held off in finishing the pdf till these components come in, wanted to do the picks with parts that I can get all the time for the cells. I hated the doing it out of stuff I bought from the discount hardware stores as I had to substitute with dissimilar parts.
I am also working on a heat shrink deal. Just not far enough along to share more on it.
I will work up pricing for the kit tomorrow, but wanted you all to know it is a happening thing. I am working on it all actively. Time frame for this all to happen is approximately a week, maybe a week and a half. Some of the parts in the quantities involved are 7 to 10 day lead time on my ordering for me.
Just a heads up, happy building all!!!